Nyc Marathon Verrazano Bridge Closure 2024

Nyc Marathon Verrazano Bridge Closure 2024. Updated march 11, 2024 10:08am. On saturday, and will remain closed until 4 p.m.


Nyc Marathon Verrazano Bridge Closure 2024

Beginning at midnight on sunday, november 6th the upper level of the verrazano narrows bridge will be closed to vehicle traffic. The race starts on staten island by running over the verrazano bridge.

7, 2021, For The City.


Beginning at midnight on sunday, november 6th the upper level of the verrazano narrows bridge will be closed to vehicle traffic.

In Addition, The Upper Level Of The Verrzazzano Will Be Closed Starting At 11 P.m.


On sunday and will reopen at approximately 4 p.m.

The Bay Street And Lily Pond Avenue Exits Of The Staten Island Expressway Will Close At 3 A.m.


5, to allow for roadway preparation, and will remain closed.

Images References :

On Sunday, November 6Th, And Reopen At Approximately 4 P.m.


5, to allow for roadway preparation, and will remain closed.

Updated November 2, 2022 2:45 P.m.


94th street between fort hamilton parkway and 4th avenue.

Verrazzano Narrows Bridge Will Be Closed To All Vehicular Traffic Between 7 A.m.


On saturday, and will remain closed until 4 p.m.